Skip to content
A narrow canal curves through grassy banks with trees and a bridge in the distance.

Government infrastructure

Haley & Aldrich increases flood channel capacity with durable, cost-effective infrastructure

Summary

  • The Alameda County Flood Control and Water Conservation District needed to upgrade its Laguna Creek flood channel to handle more stormwater and meet Federal Emergency Management Agency (FEMA) 100-year flood control criteria.
  • As the county’s trusted on-call advisor, we completed a geotechnical study for the project, then managed the civil and structural design.
  • Our solution incorporated concrete floodwalls located along the district right-of-way with a smaller footprint than the existing levees, which increased channel capacity.
  • The floodwalls and other infrastructure also provided more durable, cost-effective maintenance access.

For more information, contact:

Eli Zane headshot
Eli Zane

Technical Expert, Geotechnical Engineer

Phil Gregory headshot
Phil Gregory

Senior Principal Consultant